Case Studies

CATEGORIES

Forrestfield Station Multi-Storey Car Park

BIM
ESC Engineering were engaged by the D&C builder to complete the electrical design for the new Forrestfield Multi-storey Car Park for the Perth Transport Authority (PTA). The design scope included Power Distribution, PA, Security, Lighting, ICT and Fire Detection systems. The project was required to be documented to LOD 500 using Autodesk’s Revit software. The in-house BIM team at ESC Engineering…
READ MORE

Fremantle Markets

Fire Systems
ESC Engineering was engaged by the City of Fremantle to design the dry fire systems for the Fremantle Markets as part of a wider building upgrade project. Fremantle Markets is a historical building and area located in the heart of Fremantle WA, the markets first opened its doors in 1897 and is currently the home to numerous traders and a tourist…
READ MORE

Utility Critical Infrastructure

Security
ESC Engineering were engaged to provide electronic security design services for a large critical infrastructure utility substation and employed several innovative solutions in the design to provide protection to this critical asset. The site was classified into different zones which extended far beyond the perimeter fencing which was vital due to the isolated nature of the site. This allowed for any…
READ MORE

Yarning Circle – Curtin University

ICT
ESC Engineering were engaged by the university to undertake the electrical, communications and security system design for the new Yarning Circle at the Bentley Campus entrance. In addition to the project being of significant cultural value to the university, the project was selected to trial a new technology which would eventuate in this site being the first deployment in Australia of…
READ MORE

Electrical fault investigation on high rise vertical transport system

Power Distribution
ESC Engineering were contacted by an existing client who was experiencing an unexplained power issue whereby when the newly installed fire pumps were activated during their weekly test regime, the entire vertical transportation system would shut down for a number of minutes resulting in much distress for any passengers. ESC Engineering were required to review all the existing building electrical drawings…
READ MORE

CLIENTS